Special installation pipe jacking method - List of Manufacturers, Suppliers, Companies and Products

Special installation pipe jacking method Product List

1~2 item / All 2 items

Displayed results

Introduction to Water Pipe Pushing Construction Examples and Special Installation Pipe Pushing Methods

Let's complete the plumbing work cheaply and quickly! However, when excavation is not possible, we will use the special installation pipe pushing method.

Hasegawa Construction Industry Co., Ltd. has been engaged in both large and small thrust construction projects for over 20 years. Here are some examples of the projects carried out by Hasegawa Construction Industry. One example is a project in Oohara, Isumi City, where we crossed a national highway. We created a launch shaft with a diameter of φ2.0m within the application site and thrust to the main pipe on the opposite side of the road. The thrust construction involved pushing a lead pipe (temporary pipe) from the launch shaft towards the main pipe, and then pulling in a φ50A steel pipe from the main pipe side. The construction from the creation of the launch shaft to the thrust work was completed in one day. Additionally, in Karabe, Narita City, we thrust a lead pipe to the main pipe located on the opposite side of the application site, which has four lanes (five lanes including the right turn lane), and we pushed a φ100mm steel casing pipe from the launch shaft. The thrust length was 22.3m. As such, we can construct by building the launch shaft within the application site without excavating on public roads. 【Proposal from Hasegawa Construction Industry】 - After thrusting a φ65A steel pipe, we completed the installation of a φ50A steel casing pipe. - Connection with continuous water drilling by waterworks contractors. - Installation of the main pipe inside the casing pipe. → It is also possible to directly pull in poly pipes or stainless steel pipes without using a casing pipe. For more details, please contact us or download the catalog.

  • Waterproofing work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Special Installation Pipe Advancement Method "Good Mall"

The adoption of the newly developed seismic isolation joint in the pressure support pipe has further improved its seismic resistance, durability, and waterproofing.

"Good Mall" is a construction method for sewer installation pipes that has developed special branch pipes, achieving perfect installation, water stopping, and waterproofing. The installation of Hume pipes is ensured through the use of tight-fitting branches and expansion packers, guaranteeing secure installation and a smooth interior finish. Since its development in 1996, the pressure branch pipes and pressure branch pipe connection devices have been adopted nationwide as a safe and reliable method for public sewer systems and other applications. [Features] ■ Capable of responding to various sites with abundant technology and experience ■ Achieves perfect water stopping through the use of pressure branch pipes ■ Employs triple waterproofing measures ■ Utilizes seismic isolation rubber joints (DJB) ■ Reduces overall construction and maintenance costs *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration